Biden-Harris Administration Proposes to Strengthen Lead Paint Standards to Protect Against Childhood Lead Exposure

EPA

Washington, DC – EPA announced a proposal to strengthen requirements for the removal of lead-based paint hazards in pre-1978 buildings and child care facilities, known as abatement activities. The proposal would reduce the DLHS from 10 micrograms per square foot (µg/ft2) for floors and 100 µg/ft2 for window sills to any reportable level greater than zero in recognition of the fact that there is no level of lead in dust that has been found to be safe for children. Today’s proposal would lower the DLCL from 10 µg/ft2 to 3 µg/ft2 for floors, from 100 µg/ft2 to 20 µg/ft2 for window sills, and from 400 µg/ft2 to 25 µg/ft2 for window troughs, which are the lowest post-abatement dust-lead levels that the Agency believes can be reliably and effectively achieved. For the full EPA Press Release, click here.